RLC MM FEB-UI

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of ANALISIS PERHITUNGAN PENCADANGAN MODAL RISIKO OPERASIONAL PADA PORTOFOLIO SUBMARINE CABLE SERVICE: STUDI KASUS PT TELKOMINFRA

Text

ANALISIS PERHITUNGAN PENCADANGAN MODAL RISIKO OPERASIONAL PADA PORTOFOLIO SUBMARINE CABLE SERVICE: STUDI KASUS PT TELKOMINFRA

KUSUMAWARDHANI, FEBRIYATI - Personal Name; SUARDI, LENNY - Personal Name;

Penelitian ini menyajikan analisa dari hasil pengolahan data risiko operasional pada portofolio Submarine Cable Service di Telkominfra. Tujuan penelitian ini adalah untuk mengetahui risiko yang sering terjadi, mengetahui akar masalah, memberikan mitigasi risiko, dan mengetahui besar pencadangan modal yang diperlukan portofolio Submarine Cable Service Telkominfra. Penelitian ini dilakukan dengan metode kualitatif yaitu wawancara untuk mengetahui risiko, akar masalah, dan usulan mitigasi risiko, serta metode kuantitatif untuk menghitung pencadangan modal. Perhitungan pencadangan modal dilakukan dengan mencari nilai Operation Risk Variance (OpVar) menggunakan metode Monte Carlo simulation. Hasil penelitian menunjukan bahwa risiko yang paling sering terjadi dan memiliki dampak paling besar yaitu risiko keterlambatan akibat ketidaktersediaan kapal. Telkominfra memerlukan pencadangan modal sebesar Rp 2,163,975,476 per kejadian sebagai bentuk mitigasi risiko keterlambatan pekerjaan pada portofolio Submarine Cable Service untuk menjaga kestabilan likuiditas perusahaan.


Availability
300068366836RLC MM (Rak Tesis)Available
Detail Information
Series Title
Tesis
Statement of Responsibility
Febriyati Kusumawardhani
Call Number
6836
Publisher
Salemba, Jakarta : Magister Manajemen FEB UI., 2022
Collation
in processus
Language
Indonesia
ISBN/ISSN
-
Classification
650
Content Type
text
Edition
-
Subject(s)
Tesis
Empirik
Manajemen Risiko
Capital Reserves
Operational Risk
Monte Carlo
Submarine Cable
Climate Mitigation
2022
Specific Detail Info
-
Other version/related

No other version available

File Attachment
No Data
Comments

You must be logged in to post a comment

RLC MM FEB-UI
  • Information
  • Services
  • Librarian
  • Member Area

About Us

RLC MM-FEBUI (Library) occupies the right side of the ground floor of the MM FEB UI Building with a reading room capacity of more than 60 people.
 
The MM-FEB UI library service system is closed (closed access); where the user does not have direct access to the collection shelf. Or in other words, users are not allowed to take their own books from the collection shelf

Search

start it by typing one or more keywords for title, author or subject


© 2025 — RLC MM FEB UI

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search