RLC MM FEB-UI

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of ANALISIS PENERAPAN LEAN MANUFACTURING MELALUI VALUE STREAM MAPPING PADA PROSES MANUFACTURING ANEKA PRODUK EMAS UNIT BISNIS PENGOLAHAN DAN PEMURNIAN LOGAM MULIA PT. ANTAM TBK

Text

ANALISIS PENERAPAN LEAN MANUFACTURING MELALUI VALUE STREAM MAPPING PADA PROSES MANUFACTURING ANEKA PRODUK EMAS UNIT BISNIS PENGOLAHAN DAN PEMURNIAN LOGAM MULIA PT. ANTAM TBK

SIMAMORA, ASFHANDA - Personal Name; INSANITA, RIZQIAH - Personal Name;

Proses manufacturing di Biro Manufaktur UBPP LM mulai weighing sampai dengan engraving terdapat beberapa aktifitas non value added seperti pencatatan/rekaman produksi secara manual, belum adanya standarisasi dan digitalisasi yang menyebabkan loss time serta operator memerankan peranan penting didalam proses produksi sehingga apabila terjadi kesalahan dapat menyebabkan ketidaksesuaian produk yang dihasilkan. Tujuan penelitian ini mengidentifikasi dan mengeliminasi berbagai pemborosan yang ada dalam proses manufacturing menggunakan Value Stream Mapping (VSM). Pendekatan VSM untuk memahami manufacturing emas yang dipetakan dalam current state map serta improvement yang diterapkan pada future state map dengan tujuan menghilangkan pemborosan, mengurangi cycle time dan akhirnya akan meningkatkan produktifitas.

Cycle time di proses weight check, cleaning, press dan gravir untuk tiap varian gramasi masih di atas 7,2 detik per pcs (takt time) dengan target harian 9,000 keping. Usulan improvement dibuat dalam skenario prioritas untuk menghilangkan waste ataupun non value-added activities seperti re-layout equipment, peremajaan peralatan punch, press, gravir. Dengan penerapan improvement yang diusulkan maka dampak yang diberikan yaitu penurunan cycle time terhadap takt time. Dari perbandingan cycle time sebelum dan sesudah improvement menunjukan penurunan signifikan terhadap cycle time dengan persentase yaitu 68,76% jika usulan improvement diterapkan semuanya.


Availability
300070807080RLC MM (Rak Tesis)Available
Detail Information
Series Title
Tesis
Statement of Responsibility
Asfhanda Simamora
Call Number
7080
Publisher
Salemba, Jakarta : Magister Manajemen FEB UI., 2023
Collation
xv, 132 p. : ill. ; 30 cm.
Language
Indonesia
ISBN/ISSN
-
Classification
650
Content Type
text
Edition
-
Subject(s)
Tesis
Case Study
Manajemen Operasi
Lean Manufacturing
Value Stream Mapping
Cycle Time
Gold Manufacturing
2023
Specific Detail Info
-
Other version/related

No other version available

File Attachment
No Data
Comments

You must be logged in to post a comment

RLC MM FEB-UI
  • Information
  • Services
  • Librarian
  • Member Area

About Us

RLC MM-FEBUI (Library) occupies the right side of the ground floor of the MM FEB UI Building with a reading room capacity of more than 60 people.
 
The MM-FEB UI library service system is closed (closed access); where the user does not have direct access to the collection shelf. Or in other words, users are not allowed to take their own books from the collection shelf

Search

start it by typing one or more keywords for title, author or subject


© 2025 — RLC MM FEB UI

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search