RLC MM FEB-UI

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of PENGAMBILAN KEPUTUSAN OPSI PENGEMBANGAN FASILITAS REST AREA SESUAI HIGHEST AND BEST USE DENGAN METODE ANALYTIC NETWORK PROCESS: STUDI KASUS: REST AREA JALAN TOL TRANS SUMATERA RUAS TEBING TINGGI – PARAPAT

Text

PENGAMBILAN KEPUTUSAN OPSI PENGEMBANGAN FASILITAS REST AREA SESUAI HIGHEST AND BEST USE DENGAN METODE ANALYTIC NETWORK PROCESS: STUDI KASUS: REST AREA JALAN TOL TRANS SUMATERA RUAS TEBING TINGGI – PARAPAT

HAMDANI - Personal Name; HADISUMARTO, ASWIN DEWANTO - Personal Name;

Tesis ini melakukan analisa terkait kebutuhan masyarakat terhadap konsep rest area pada Jalan Tol Trans Sumatera Ruas Tebing Tinggi – Parapat. Penelitian ini dilatarbelakangi karena perencanaan rest area yang ada saat ini masih belum efektif secara konsep dan kurang memerhatikan aspek komersial. Padahal dengan sisi komersial rest area yang optimal, biaya pemeliharaan rest area dapat dibiayai dari pendapatan yang diperoleh. Dengan demikian, Perseroan tidak perlu mengeluarkan biaya tambahan untuk pemeliharaan, mengingat terdapat beban keuangan Perseroan yang diakibatkan oleh pembangunan JTTS yang tidak layak secara finansial. Analisis yang digunakan dalam penelitian ini adalah Model Analytic Network Process (ANP) yang nantinya akan dibagi menjadi 3 cluster yaitu cluster tujuan, cluster kriteria, dan cluster alternatif. Klaster tujuan merupakan tujuan akhir yang ingin dicapai dalam penelitian ini. Kriteria cluster merupakan kriteria penilaian yang digunakan dalam penelitian ini berdasarkan analisis benchmark rest area eksisting, studi literatur, dan validasi ahli. Klaster alternatif merupakan pilihan pengembangan yang diperoleh dari hasil analisis penggunaan tertinggi dan terbaik.


Availability
300070957095RLC MM (Rak Tesis)Available
Detail Information
Series Title
Tesis
Statement of Responsibility
Hamdani
Call Number
7095
Publisher
Salemba, Jakarta : Magister Manajemen FEB UI., 2023
Collation
xiii, 136 p. : ill. ; 30 cm.
Language
Indonesia
ISBN/ISSN
-
Classification
650
Content Type
text
Edition
-
Subject(s)
Tesis
Case Study
Manajemen Pemasaran
The Concept of Rest Area
Analytic Network Process
Trans Sumatera Toll Road
2023
Specific Detail Info
-
Other version/related

No other version available

File Attachment
No Data
Comments

You must be logged in to post a comment

RLC MM FEB-UI
  • Information
  • Services
  • Librarian
  • Member Area

About Us

RLC MM-FEBUI (Library) occupies the right side of the ground floor of the MM FEB UI Building with a reading room capacity of more than 60 people.
 
The MM-FEB UI library service system is closed (closed access); where the user does not have direct access to the collection shelf. Or in other words, users are not allowed to take their own books from the collection shelf

Search

start it by typing one or more keywords for title, author or subject


© 2025 — RLC MM FEB UI

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search